Rearranged portion of a field drawing of the profile of one of the trenches hand-excavated through the Millington site in 1938-1939 by WPA workers. Lehmer and Kelley used these trenches to explore the site and document additional structures beyond those chosen for excavation. TARL Archives. Enlarge to see more detail. |